UPDATED - Stena Line Update : Essential Maintenance Completed - Stena Line Berth in Dublin
We have been advised by Dublin Port authority of the requirement for essential repairs to the upper level of the two-tier berth used by Stena Line in Dublin. We have worked with the authority to find the least impactful way of undertaking this remedial work, which will take place between April 24th (today) and June 12th. During this period, when on this berth, our vessels will discharge and load in Dublin via their main decks only.
Stena Superfast X main deck is restricted to 4.45m deck-height and it will not be possible to carry vehicles above this height on any of her sailings; that is, the 0855 hrs and 2030 hrs ex Holyhead and the 0215 hrs and 1450 hrs ex Dublin.
Stena Adventurer sailings (0230 hrs and 1400 hrs ex Holyhead and 0810 hrs and 2040 hrs ex Dublin), will not be height constrained during this period.
We will do our utmost to keep disruption to the absolute minimum during this period and thank you for your understanding of this unavoidable maintenance.
Stena Line Freight